Screed Build Up

We are currently on-site at the Spa Askern Academy in Doncaster where we have uplifted the old timber floor and removed the underfloor heating system, the finished floor height measured 60 mm

We needed to ensure that the new sports floor worked with all the door thresholds there was also a reluctance by the school to reinstall a timber subfloor ( the floor had been flooded hence the need to replace it ) Our go-to solution in this instance is a Mapei Topcem  fully bonded screed